I'm a procurement manager at a 34-person hospitality design studio. I manage roughly $430,000 a year in lighting spend across hotels, restaurants, and offices. For six years I've tracked every invoice, every P.O., and every rework in our cost system. This is my honest take on a question I keep hearing: should we specify a Tom Dixon floor lamp or a Melt wall light, or should we go OEM/private label to save money?
The short answer: it depends on the total cost, the compliance risk, and the design impact. Let me walk through the comparison the way I'd run it for a real project.
The comparison framework I use
When I say OEM, I mean a manufacturer builds a fixture to your specifications. When I say private label, I mean a manufacturer sells you an existing design and you put your brand on it. I know definitions vary. I'm using these because they're how my purchase orders are actually written.
For a branded fixture like a Tom Dixon Melt wall light, the design is already done. For a private-label ceiling light or a bulk floor lamp, the design may be done—or you may be starting from a sketch. That difference drives everything else.
In commercial lighting private label projects, the cost difference is rarely as simple as the quote. Let me show you why.
Dimension 1: Total cost of ownership—and the hidden engineering bill
On paper, the branded fixture costs more per unit. Stop there and you'll miss the obvious. With a branded Tom Dixon floor lamp, the specification already exists—photometric data, dimming compatibility, installation drawings, finish samples. You pay a premium, but you do not buy a development project.
With OEM or private label, you're paying for engineering, sampling, tooling, and rework—whether you see it on the invoice or not. I remember reviewing a quote for a custom private-label ceiling light. The per-unit price looked great. But it excluded the compliance documentation, the thermal test, the finish color approvals, and my trip to inspect the first article. Once I added those back, the savings nearly disappeared. It took about six weeks—or rather, eight when you count the compliance review.
I assumed 'same specifications' meant the same result across two vendors. Didn't verify. Turned out the 'brushed brass' finish was PVD on one sample and lacquered brass on the other. That single assumption cost us three weeks and a redo.
That lesson scales with a bulk floor lamp order. The larger the volume, the easier it is to hide development costs inside the unit price—and the harder it is to walk away after the first article is wrong. If I remember correctly, our break-even calculation on one custom floor lamp showed we needed 110 units to beat the branded option. Don't quote me on that exact number; the spreadsheet has since been rebuilt. But the point stands: private label only wins if the volume is real.
There's also a difference between OEM and private label within this dimension. An OEM relationship lets you own the design. You pay for the tooling, but the tooling is yours. Private label is faster and cheaper at the start, but you're renting someone else's design. If the factory discontinues it, you're back at square one. For a ceiling light OEM vs private label decision, I now ask one question: who owns the design when you dispute the factory? With OEM, you. With private label, them.
Dimension 2: Compliance and liability—where private label gets dangerous
This is the dimension that young procurement professionals undervalue. Even if the design is identical, responsibility is not. When you specify a branded Tom Dixon fixture, the brand owner carries the compliance burden. When you private label a product, your company becomes the responsible party. The label says 'made for us'; in most jurisdictions, the law looks to us. That's a serious shift.
Per FTC guidance (ftc.gov), advertisers must have evidence to substantiate product claims. If your brand is on a luminaire, the performance and quality promises are yours to back—not the factory's.
That's not just about marketing language. Electrical and safety compliance obligations also sit with the brand in most markets. Factories can give you test reports, but a report in their name isn't the same as a file in your name. You need permission to reference it, you need someone who can read the whole document, and you need to catch gaps before the fixture goes into a building.
The counterintuitive conclusion: private label doesn't reduce risk. It transfers risk to you. That can be smart if you have technical procurement staff and an appetite for that responsibility. It's dangerous if your only tool is a spreadsheet.
Dimension 3: Design impact and project identity
Now the part that doesn't fit in a spreadsheet. A Tom Dixon Melt wall light isn't just a light source. The seamless glass-like sphere and the amber reflection create a specific atmosphere. A private-label version may copy the shape, but the optical effect usually isn't the same. If the design concept says Melt, the client will notice the substitution.
Same with a Tom Dixon floor lamp. In a hotel lounge, the brand does real work—it signals taste, it photographs well, it creates a moment. That's a tangible project benefit, not aesthetic snobbery. For a back office or a temporary event setup, that premium may not earn its keep.
I have mixed feelings about private-label lighting. On one hand, it lets a smaller brand create a distinct design identity. On the other, I've seen it turn into a whole project outside the project—not because the factory was bad, but because nobody owned the spec until it was too late.
Now, in a bulk floor lamp order, the design impact math changes. I once sourced 60 floor lamps for a co-working building. The client wanted an elegant tripod base but no logo constraints. We developed a private-label floor lamp with a custom shade. It looked intentional, it saved money, and the client got a unique identity. But it took four months and three prototypes. If the client needed an iconic statement, the branded route would've been worth every extra dollar.
Even after choosing the branded route on another project, I kept second-guessing. What if the budget overrun killed the next phase? The weeks until delivery were stressful. But the fixtures installed perfectly, and the client asked where they could buy more. There's something satisfying about handing an installer a complete spec package and walking away. After all the private-label prototype chases, that moment is the payoff.
What I'd tell a buyer on the fence
I won't tell you one option is always better. I will tell you the hidden work is where the real cost lives. Before you issue a P.O., run through these scenarios:
- Spec the Tom Dixon fixture when the design concept names it, when you need known compliance documentation, and when you can't absorb engineering surprises.
- Go OEM when you have technical procurement support, need a custom size or finish, and can amortize tooling across enough units.
- Choose private label only if the catalog product truly fits the project, you're comfortable owning compliance, and you have someone who can flag spec mismatches before production.
My rule for every ceiling light, floor lamp, or wall light decision: verify before you commit. 5 minutes of checking specifications beats 5 weeks of rework. The cheapest purchase order is the one you don't have to reissue.
So, branded Tom Dixon or private label? For me, it's not an identity question. I use both. The difference is that I now ask the five questions—who owns the compliance file, who approves the first article, what happens if the finish fails, what's the replacement lead time, and what's the real engineering cost per unit—before I get excited about a lower quote.

